Skip to main content

Exchanges

A normalized view of every venue DataMaxi+ covers — volume, fees, average funding, and a signal column for at-a-glance comparison.

Exchanges

Treemaps

Top of the page, three side-by-side treemaps:

  • Spot Volume — share of 24h spot volume by venue (Binance, Bybit, MEXC, …).
  • Open Interest — share of perp OI by venue.
  • Liquidations — share of 24h liquidations by venue.

Cell size encodes share, cell color encodes 24h delta. A glance tells you who's dominating each surface today.

Filter pills

  • All · CEX · DEX · Korea — narrow the table.
  • Window1H · 4H · 24H selects the time horizon for the volume / funding stats.

Main table

ColumnWhat it shows
Exchange ▼venue name + logo
Spot vol 24h ▼24h spot trade volume
Futures vol 24h ▼24h perp / futures volume
Total vol 24h ▼sum of the two
Spot taker ▼reference spot taker fee
Futures taker ▼reference perp taker fee
Avg funding ▼average current funding across the venue's perps
Signalvenue health / activity signal chip

Sort by any column. The fee columns reflect the public reference rates — your actual rate depends on your VIP tier on the venue.

Detail view

Clicking any exchange row navigates to /exchanges/<venue> — a per-venue profile.

Exchange detail

  • Venue name + logo + region/jurisdiction.
  • One-paragraph venue description (year established, scope, typical use cases).
  • Headline stats: Spot volume (24h), Futures volume (24h), Total volume (24h), Funding (24h) with delta.

Section tabs

Funding rates · Premium · Listings events — switches the lower panel between the three datasets surfaced for this venue.

Transfer matrix

Two condensed rows of venue chips representing where assets can be transferred to/from this venue. Each chip is colored by lane direction. Useful when planning cross-venue legs.

Markets table

Symbol-level table for the venue:

ColumnWhat it shows
Symbolbase / quote pair
Lastlast price
24h %24h price change

Pagination at the footer for the full universe.

When to use this page

  • You're picking a venue for a new leg — compare fees and depth side-by-side.
  • You're sizing strategy capacity — how much do you need to deploy to be 1% of a venue's 24h volume.
  • You're risk-watching — a venue with collapsing volume but rising funding is often a tell.